Skip to content
Window Tint PhillyPowered by Shore Tint & More — est. 1989
Commercial curtain wall glazing on a Philadelphia office building

3M commercial architectural window film — Philadelphia

Commercial window film, specified against the glass it goes on.

Window Tint Philly installs 3M architectural window film on commercial and institutional buildings across Philadelphia, Montgomery, Delaware and Chester Counties, and the surrounding Pennsylvania market. Powered by Shore Tint & More, a second-generation film company established in 1989.

Established 1989
Shore Tint & More
Second generation
Family-operated film company
Mid-Atlantic commercial
Institutional, education, healthcare
3M architectural film
Commercial product families
Multi-site programs
Regional rollouts across states
Occupied-building work
Nights, weekends, phased

3M film families

The product line, and where each one belongs.

3M manufactures the film. We specify and install it — against the glass, the exposure and the appearance constraint of the actual building.

Commercial office glazing treated with 3M solar control window film

Solutions

Eight commercial problems, and the film scope that answers each one.

Commercial project process

How a commercial film project actually runs.

  1. 01

    Site / plan review

    Drawings, glazing schedules, elevations, the specification section — or photographs and a description if the building has no documents. We read what you send and come back with questions about the glass.

  2. 02

    Glass identification

    Field verification of construction, coatings, strengthening, unit makeup, frame condition and any existing film. This is the step that decides what can safely be specified.

  3. 03

    Film / system selection

    Product chosen against the glass, the exposure, the appearance constraint and the requirement. Where security scope is involved, the attachment method is selected here too.

  4. 04

    Sample or mock-up

    Physical samples for product data and design review, and on larger or appearance-sensitive projects a mock-up on the actual glass before the full installation.

  5. 05

    Budget / proposal

    Line-item scope by elevation or partition type, with quantities, assumptions, access method and manufacturer product data attached.

  6. 06

    Installation coordination

    Sequencing around occupancy, trades, clinic hours, school breaks or trading hours — including night and weekend work, access, COIs and freight.

  7. 07

    Installation

    Interior application by our own crews, area by area, with the space protected and returned to service each shift.

  8. 08

    Closeout / product information

    Documented product and quantities by elevation, care instructions and manufacturer warranty documentation for the facility record.

Actual project requirements vary. Some projects skip the mock-up; some add submittal review, phasing plans or attachment detailing. The sequence above is the default, not a fixed contract.

Representative regional experience

Commercial and institutional work completed across the Mid-Atlantic.

These are regional projects, not Philadelphia case studies. Philadelphia work is published here as it completes.

Corporate office interior with floor-to-ceiling glazing treated with commercial solar control window film

Corporate officeRegional, DE

JPMorgan Chase — regional facilities

Corporate office glazing generating perimeter heat and screen glare on staff working at monitors near the exterior wall.

Roughly 5,000 square feet of commercial window film across regional Chase facilities, applied from the interior on occupied floors.

  • Approx. 5,000 sq ft
  • Regional facilities
  • Interior application
School entrance glazing treated with safety and security window film

EducationGeorgetown, DE

Sussex Academy

Charter school seeking to harden existing entry and ground-floor glazing without replacing openings or changing the appearance of the building.

Safety and security film retrofitted to existing glazing and framing, scoped by opening so funding concentrated on the glass that sits on a realistic entry path.

  • Retrofit to existing glazing
  • Scoped by opening
  • Scheduled around the calendar

EducationSeaford, DE

Seaford School District

District glazing needing added privacy and a glass-retention upgrade on existing openings, without replacing windows or doors.

Privacy and safety/security film retrofitted to existing glazing, with 3M impact protection attachment (IPA) applied around the perimeter of the treated openings so the film is anchored to the frame rather than the glass alone.

  • Approx. 500 sq ft of film
  • Approx. 480 LF 3M IPA perimeter attachment
  • Existing glazing retrofit
All representative projects →

Next step

Send the glass, the elevation and the complaint.

Site survey for existing buildings, plan review for projects in design. Either way the first conversation is about the glass.